
Why London's Tiny Railway Under The Thames Failed
17 Oct 2026
5m
There's always a reason. Especially with planes, trains or boats which is what this channel is all about.







The 1994 opening of the £130 million Waterloo International terminal served as a temporary solution for Eurostar services while the dedicated High Speed 1 (HS1) rail link to London remained under construction. Although architect Nicholas Grimshaw’s award-winning design successfully integrated 400-meter platforms and co...













Follow this podcast in Podwise
Sign in to get AI summaries, transcripts and mind maps for any episode, including new ones.
