17 Mar 2022
38m
10 - Building a 3800km interconnector with Richard Hardy (Project Director @ Xlinks)
Transmission
Open in Podwise to generate AI notes
Sign in to process this episode and unlock summaries, transcripts, highlights and translations.
Shownotes are not generated by Podwise.

