08 Jun 2024

CBRE: India is on track to add up to 850 MW of data center capacity by the end of 2026, outpacing South Korea at 495 MW and Japan at 407 MW over the same period (Nikkei Asia)

Podcast cover

Techmeme

Open in Podwise to generate AI notes

Sign in to process this episode and unlock summaries, transcripts, highlights and translations.

Open in Podwise

Shownotes are not generated by Podwise.

CBRE: India is on track to add up to 850 MW of data center capacity by the end of 2026, outpacing South Korea at 495 MW and Japan at 407 MW over the same period (Nikkei Asia)